• Expert Technical Supervision

    Our experts oversee every stage of your project, ensuring top quality and safety standards.

  • Precise Installation Services

    Our specialized team ensures seamless installation of Mega Panels and Flexi Panels with perfect alignment and secure fit

  • Custom Design Consultation

    We create bespoke solutions tailored to your needs, ensuring innovative design and superior functionality.

  • Quality Assurance Control

    We maintain top-quality standards with rigorous inspections and testing throughout the construction process.

  • On-Site Training Support

    Our trainers provide hands-on instruction and ongoing support, empowering your team with essential skills.

  • Post-Installation Inspection

    We offer thorough inspections and maintenance solutions to ensure long-term durability of your structures.

Installation Steps for Luftcrete LC Panels

1. Preparation

  • Site Preparation- Ensure the construction site is clean and leveled.
  • Tools Required- Measuring tape, spirit level, saw, drill, screws, and construction adhesive.
  • Safety Gear- Wear appropriate safety gear including gloves, goggles, and a hard hat.

2. Layout Planning

  • Mark the Layout- Use a chalk line to mark the positions where the Luftcrete LC Panels will be installed.
  • Check Measurements- Double-check all measurements to ensure accuracy.

3. Panel Handling

  • Transporting Panels- Use appropriate lifting equipment to transport the panels to the installation site.
  • Positioning Panels- Carefully position the panels according to the layout plan. The lightweight nature of Luftcrete LC Panels makes this step easier.

4. Installing the Panels

  • Starting Point- Begin at a corner or edge of the structure.
  • Tongue and Groove Alignment- Align the tongue and groove edges for a secure fit. Apply construction adhesive along the grooves for added stability.
  • Securing Panels- Use screws to secure the panels to the framework. Ensure screws penetrate the reinforced double steel bar mesh for maximum strength.

5. Finishing Touches

  • Check Alignment- Use a spirit level to check the alignment of each panel.
  • Seal Joints- Apply a suitable sealant to all joints to ensure airtightness and water resistance.
  • Final Inspection- Inspect the installation for any gaps or misalignments and make necessary adjustments.

Set your project up for success by using Luftcrete's services and products.

Ready to build your project? Let’s talk about your plans.